« Back to story "FPL Receives Approval to Build First Commercial-Scale Solar Power Facilities in Florida"

Story Comments

Posted by: TonyByron 1 year, 5 months ago

This page is a permanent archive of the comment below and its replies.
To view this comment in the context of the full discussion for the story, use this link.

All Comments Share Story Report

  • Neutral
    TonyByron1 year, 5 months ago

    This comment is below the standard viewing threshold View It ยป

    "I am a fan of wind and solar but neither is an instant panacea."

    nor is drilling, Tony."

    Of course not eco, but we will still need substantial amounts of oil for at least 20 years during our transition from oil. It makes sense to get that oil from home instead of overseas. The money will be spent in the US.

    "I am not an expert, but, even on low sun days, there is a reserve, right?"

    Not sure what you mean by that eco. Please elaborate.

    (comment_max_expanded_depth : 55) (comment depth : 4) (recursion depth : 1) (max_comment_reply_depth : 40) (comment_max_render_depth : 55)
    Reply
    loading loading ...

    Post Reply

    You are not signed in to Propeller.com. Please sign in to post a reply.

    People Who Liked This Comment (2)

    People Who Didn't Like This Comment (0)

    No one voted this comment negatively.

    Submit a Story

    Advertisement

    Story Tags ?

    Hey! If you Sign In, you can add tags to this story!

    Dropping This Article

    No one has dropped this story.

    Groups Watching This

    No groups are watching this story. Why not share it with your groups?

    Also Submitted By

    No one else has submitted this story.